Permit Information

Permit Number:  
IND-131-290278-1
Project Name:  
Mack Bayou Residence
 
Sequence Type:  
New/Creation
Permit Type:  
ERP Individual
County:  
Walton
 
Received:  
11/26/2019
Decision Date:  
01/28/2020
Expiration Date:  
01/28/2025
Description:  
designed to provide treatment and attenuation for a new development located at the intersection of East Mack Bayou Drive and Mack Bayou Road in Santa Rosa Beach, (Walton County). The proposed development will consist of the construction of an approximately 37.63-acre apartment complex with associated roadways and driveway connections to East Mack Bayou Drive and Mack Bayou Road. The proposed surface water management system will consist of the construction, operation and maintenance of two dry retention ponds and two wet detention ponds located throughout the property. The applicant proposes to permanently fill 0.498-acres of wetland area for two road crossings and thirteen minor fill areas ranging from 53 square feet to 2,410 square feet primarily for retaining walls necessary to separate the uplands from the wetlands.
Project Status:  
Issued
Recommendation:  
Applicant:  
Crest Residential
Owner:  
Agent:  
BIOME
Current Process Stage:
Compliance  
Wetlands:  
Yes
 
Consultant:  
Innerlight Engineering Corp, Innerlight Engineering Corp., Innerlight Engineering Corp.
 
Reviewer Name
Phone Number
Brandon Winter
(850)539-5999
Ken Greenwood
      
Documents
Trouble viewing files? Click here for help.

documents in folder Application  (14)

documents in folder Correspondence  (1)

documents in folder RAIs, RAI Responses and Timeframe Correspondence  (12)

documents in folder Technical Staff Report  (1)

documents in folder Final Documents  (2)

documents in folder Permit  (1)
Permit Application Processing Stages
There are different stages that a permit application goes through until it is issued and/or closed.
 
Data Capture
The application submittal is being verified by Administrative staff before being routed to Regulatory staff for technical review.
 
Review
Application is under technical review by Regulatory staff.
Timeline: Staff has 30 days to review the new application or the RAI Response from the date it was received.
 
Pending RAI Response
Request for additional information (RAI) was sent to permittee/consultant and District staff is waiting on a response.
Timeline: Applicant has 90-days to respond to a RAI
 
Note:  The project may alternate between 'Review' and 'Pending RAI Response' stages more than once.
 
 
Note:  Most ERP applications are staff issued and do not require Governing Board action.
 
Compliance
The Permit is issued/active and in compliance tracking stage. For ERP projects, the permit may by in the construction phase or the O&M phase.
 
Rescinded
Permit is annulled and no longer active.
 
Closed