Information as of : 12-Aug-2020 12:30:37 AM

Permit Information

Permit Number:  
IND-091-9416-5
Project Name:  
DMC Phase 2 Residential
 
Sequence Type:  
Modification
Permit Type:  
ERP Individual
County:  
Okaloosa
 
Received:  
11/26/2019
Decision Date:  
01/03/2020
Expiration Date:  
01/03/2025
Description:  
designed to provide treatment and attenuation for the next phase in the Deer Moss Creek/Ruckel Property master planned development, located along the north side of Rocky Bayou Drive, in Niceville, (Okaloosa County). The next phase will consist of the construction of a single-family residential subdivision with associated roadways, cul-de-sacs, amenity area with parking spots, and driveway connections to Deer Moss Loop. The surface water management system will consist of the construction, operation, and maintenance of two dry retention ponds to be installed near the northwestern and southwestern corners of the development. The eastern portion of the development will be captured, conveyed, and treated within モBasin Aヤ which was permitted under IND-091-9416-3; which was permitted under IND-091-9416-3. This permit will adjust the permitted basin boundary for this pond to include an additional 22.92 acres (total basin area is 32.85 acres) now being directed and treated by the pond. Each pond has been designed to discharge through a control structure outfalling into the wetland system that wraps around the northern, western, and southern boundaries of the project site. The proposed project is not anticipated to impact onsite wetlands.
Project Status:  
Issued
Recommendation:  
Applicant:  
Ruckel Properties, Inc.
Owner:  
Agent:  
Current Process Stage:
Compliance  
Wetlands:  
No
 
Consultant:  
Jenkins Engineering, Inc., Wetland Sciences
 
Reviewer Name
Phone Number
Dana Palermo, P.E.
(850)951-4660
Ted Reese
(850)951-4660
      
Documents
Trouble viewing files? Click here for help.

documents in folder Application  (14)

documents in folder Correspondence  (1)

documents in folder RAIs, RAI Responses and Timeframe Correspondence  (6)

documents in folder Technical Staff Report  (1)

documents in folder Final Documents  (2)

documents in folder Permit  (1)
Permit Application Processing Stages
There are different stages that a permit application goes through until it is issued and/or closed.
 
Data Capture
The application submittal is being verified by Administrative staff before being routed to Regulatory staff for technical review.
 
Review
Application is under technical review by Regulatory staff.
Timeline: Staff has 30 days to review the new application or the RAI Response from the date it was received.
 
Pending RAI Response
Request for additional information (RAI) was sent to permittee/consultant and District staff is waiting on a response.
Timeline: Applicant has 90-days to respond to a RAI
 
Note:  The project may alternate between 'Review' and 'Pending RAI Response' stages more than once.
 
 
Note:  Most ERP applications are staff issued and do not require Governing Board action.
 
Compliance
The Permit is issued/active and in compliance tracking stage. For ERP projects, the permit may by in the construction phase or the O&M phase.
 
Rescinded
Permit is annulled and no longer active.
 
Closed