Information as of : 12-Aug-2020 12:30:37 AM

Permit Information

Permit Number:  
IND-033-7973-4
Project Name:  
Woodlyn Meadows Subdivision Transfer
 
Sequence Type:  
Transfer of O&M
Permit Type:  
ERP Individual
County:  
Escambia
 
Received:  
12/05/2019
Decision Date:  
12/05/2019
Expiration Date:  
04/13/2023
Description:  
designed as a minor modification to alter the point of discharge for Pond 1 in Woodlyn Meadows which was previously permitted and converted to Operation and Maintenance. The alteration to the point of discharge for Pond 1 will include the installation of a drainage inlet along the edge of the existing energy dissipation pad, as well as connect the sand filter pipe to the new drainage inlet. Additional grading, which includes a berm along the perimeter of the property, is proposed around the two discharge structures to help direct the discharge toward the county maintained stormwater conveyance system along Sasser Lane. The minor modification is due to changes to the outfall from Pond 1 that were required by Escambia County. There are no wetlands impacts proposed.
Project Status:  
Issued
Recommendation:  
Applicant:  
Woodlyn Meadows Homeowners' Association
Owner:  
Agent:  
Current Process Stage:
Compliance  
Wetlands:  
No
 
 
Reviewer Name
Phone Number
Erica Bundrick
(850)951-4660
      
Documents
Trouble viewing files? Click here for help.

documents in folder Application  (6)

documents in folder Technical Staff Report  (1)

documents in folder Permit  (1)
Permit Application Processing Stages
There are different stages that a permit application goes through until it is issued and/or closed.
 
Data Capture
The application submittal is being verified by Administrative staff before being routed to Regulatory staff for technical review.
 
Review
Application is under technical review by Regulatory staff.
Timeline: Staff has 30 days to review the new application or the RAI Response from the date it was received.
 
Pending RAI Response
Request for additional information (RAI) was sent to permittee/consultant and District staff is waiting on a response.
Timeline: Applicant has 90-days to respond to a RAI
 
Note:  The project may alternate between 'Review' and 'Pending RAI Response' stages more than once.
 
 
Note:  Most ERP applications are staff issued and do not require Governing Board action.
 
Compliance
The Permit is issued/active and in compliance tracking stage. For ERP projects, the permit may by in the construction phase or the O&M phase.
 
Rescinded
Permit is annulled and no longer active.
 
Closed